Further information relating to Footpath 2 temporary closure (behind Rushendon Furlong)

Please find below further information relating to the temporary closure and diversions that will be in place relating to the section of footpath 2 behind Rushendon Furlong during construction works.

“Default Scenario 1: we will provide this route whenever possible, and only in unusual circumstances will we switch to temporary scenarios 2 or 3. This default scenario will provide a safe fenced off route for the public through the site.

Temporary Scenario 2: This will be required during the offsite path upgrades works which we must undertake before the site is occupied

Temporary Scenario 3: This would only be necessary in the unusual scenario where no safe route could be provided through the site. We will look to avoid this diversion route being required.”

rushendon-063-131-footpath-diversion

The closure notice includes the Byway Open to All Traffic alongside the brook which is being improved and upgraded as part of the development.  This will be shut as and when necessary for the works to be undertaken, the same as any other roadworks, at certain times during the permitted 6m period.

Leave a Reply

The owner of this website has made a commitment to accessibility and inclusion, please report any problems that you encounter using the contact form on this website. This site uses the WP ADA Compliance Check plugin to enhance accessibility.