| B489 High Street, Ivinghoe, Buckinghamshire | ||
| 30 November — 04 December | ||
| Delays likelyTraffic control (two-way signals) | ||
| Works location: close to number 47 by buildout | ||
| Works description: please clear all vegetation back to highway boundary, near buildout by Pitstone sign, 2 way lights (Vegetation – obstruction) | ||
| Responsibility for works: Buckinghamshire | ||
| Current status: Planned work about to start | ||
| Works reference: BH0025069509 | ||