Road Closure for works to traffic signals at Brownlow Canal Bridge B488 Horton Road, Ivinghoe

On the 8th of October 2018 BCC/TfB plan to start work on the traffic signals at Brownlow Canal Bridge; this work is necessary to replace life expired equipment to refurbish the traffic signals and a road closure will be needed to provide safe working space.

The B488 will be closed between Station Road, Cheddington and High Street, Ivinghoe from 9.30am to 3pm Monday to Friday starting Monday 8th October to Tuesday 23rd October.

Access will be permitted to residents, businesses and visitors but only as far as the bridge, motor vehicles will not be allowed over the bridge.

The road will be open overnight and at weekends with temporary traffic lights.

The signed diversion route will use the A4146, B440 and B489 for both directions.

The closure end date may be subject to change if works are delayed, for example by bad weather.

During these works there may be some delays and we are sorry for any inconvenience caused, if you should have any problems during these works please contact us online at www.fixmystreet.buckscc.gov.uk or in an emergency call 01296 382416.

The owner of this website has made a commitment to accessibility and inclusion, please report any problems that you encounter using the contact form on this website. This site uses the WP ADA Compliance Check plugin to enhance accessibility.