Latest roadwork and traffic interruption update from BCC TfB for 5 Nov 18 onwards

Traffic interruptions
Cheddington Road, Pitstone, Buckinghamshire
07 November — 10 January
Delays likelyRoad closure
Name: Cheddington Road
Location: Cheddington Road
Description: Streetworks / License – Streetworks
Responsibility for event: Buckinghamshire
Current status: Planned

Pitstone Road, Cheddington, Buckinghamshire
07 November — 25 February
Delays likelyDiversion route
Name: Diversion
Location: Pitstone Road
Description: Streetworks / License – Streetworks
Responsibility for event: Buckinghamshire
Current status: Planned

Roadworks
Cheddington Road, Pitstone, Buckinghamshire
07 November — 10 January
Delays likelyRoad closure
Works location: Junction of Pitstone Road, Cheddington and Cheddington Road, Marsworth to outside property number 67
Works description: Excavation to install 160m of new 150mm diameter gravity sewer, associated manholes, lateral connections and 420m of new 110mm diameter rising main within the carriageway, footway and verge. All work to be done by open cut / trenchless techniques depending on ground conditions at an average depth of 3m.
Responsibility for works: Anglian Water
Current status: Planned work about to start
Works reference: AD038SEW-10719-01

Old Farm, Pitstone, Buckinghamshire
05 November — 12 November
Delays likelyRoad closure
Works location: OUTSIDE NO2 OLD FARM. f\w. c\w.
Works description: Connections Small Service:Installation of a new electricity supply for a customer:1PH SERVICE
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON
Current status: Planned work about to start
Works reference: EC30034800160

B488 Station Road, Ivinghoe, Buckinghamshire
07 November — 13 November
Delays possibleTraffic control (multi-way signals)
Works location: 48
Works description: Trial Holes to confirm locations of existing assets
Responsibility for works: Anglian Water
Current status: Planned work about to start
Works reference: AD01454575611

Ladysmith Road, Ivinghoe, Buckinghamshire
07 November — 13 November
Delays possibleTraffic control (multi-way signals)
Works location: 48
Works description: placement of signal header in connection with job 54575611 Trial Holes to confirm locations of existing assets
Responsibility for works: Anglian Water
Current status: Planned work about to start
Works reference: AD01454575611/2

Maud Janes Close, Ivinghoe, Buckinghamshire
07 November — 13 November
Delays possibleTraffic control (multi-way signals)
Works location: 48
Works description: placement of signal header in connection with job 54575611 Trial Holes to confirm locations of existing assets
Responsibility for works: Anglian Water
Current status: Planned work about to start
Works reference: AD01454575611/1
The owner of this website has made a commitment to accessibility and inclusion, please report any problems that you encounter using the contact form on this website. This site uses the WP ADA Compliance Check plugin to enhance accessibility.