| B489 Lower Icknield Way, Marsworth, Buckinghamshire |
| 05 March — 23 March |
| Delays likelyTraffic control (two-way signals) |
| Works location: Vicarage Road to Watery Lane. |
| Works description: Traffic Signal Refurbishments |
| Responsibility for works: Buckinghamshire |
| Current status: Planned work about to start |
| Works reference: BH00215053645 |
|
|
| Vicarage Road, Pitstone, Buckinghamshire |
| 06 March — 08 March |
| Delays unlikelyTraffic control (give & take) |
| Works location: O/S NO 98 AND ACROSS JCTN WITH ROWLAND CLOSE TO 48M SOUTHEAST FROM JCTN WITH ROWLAND CLOSE ON, VICARAGE ROAD |
| Works description: Install 7m of 1 way poly duct in Verge,Install 7m of 2 poly ducts in Carriageway |
| Responsibility for works: Openreach |
| Current status: Planned work about to start |
| Works reference: BC006CT001LC500250091702 |
|
|
| Westfield Road, Pitstone, Buckinghamshire |
| 06 March — 08 March |
| Delays unlikelySome carriageway incursion |
| Works location: R/O 10 LONG HALE ON, WESTFIELD ROAD |
| Works description: Erect/Renew 1 PCP cabinet and base (600mm x 300mm x 1000mm),Install 4m of 2 poly ducts in Footway |
| Responsibility for works: Openreach |
| Current status: Planned work about to start |
| Works reference: BC006CT001LC500257048301 |
|